News

Shipping Recovery To Take Time As Malaysian Ports Prepare For Hormuz Backlog

PTP chief executive officer Mark Hardiman said any recovery in trade flows is positive for the industry. However, any increase in transshipment activity will depend on how shipping lines restore...

View More
03 Jan 2003

Malaysia's Tanjung Pelepas Port Volume Up 30% In 2002

Dow Jones

KUALA LUMPUR (Dow Jones)--Malaysia's southern Port of Tanjung Pelepas, touted as a rival to neighboring Singapore, said Thursday its container throughput rose 30% on-year in 2002 to 2.66 million twenty-foot equivalent units of containers.

Read More
17 Dec 2002

Port operators see bright prospects

The Star

Malaysian ports are making waves – thanks to a new breed of aggressive managers running our ports and the strong support of the government, in particular the Prime Minister.

Read More
17 Dec 2002

Port operators see bright prospects

The Star

Malaysian ports are making waves – thanks to a new breed of aggressive managers running our ports and the strong support of the government, in particular the Prime Minister.

Read More
09 Dec 2002

Two units of Super Post Panamax quayside cranes delivered

The Star

THE Port of Tanjung Pelepas (PTP) took delivery of the final two cranes for Phase 1 with the arrival of two units of Super Post Panamax quayside cranes from China last week.

Read More
09 Dec 2002

Two units of Super Post Panamax quayside cranes delivered

The Star

THE Port of Tanjung Pelepas (PTP) took delivery of the final two cranes for Phase 1 with the arrival of two units of Super Post Panamax quayside cranes from China last week.

Read More
04 Dec 2002

PTP takes delivery of final 2 cranes

Business Times (M)

The Port of Tanjung Pelepas (PTP), South-East Asia’s fastest growing transhipment hub, has taken cranes for Phase 1, with the arrival of two units of Super Post Panamax quayside cranes from MMC-ZPMC of China yesterday morning.

Read More
04 Dec 2002

PTP takes delivery of last two cranes for Phase 1

Schednet

THE Port of Tanjung Pelepas (PTP), Southeast Asia's fastest growing transshipment hub has taken delivery of two more Chinese-made MMC-ZPMC super post-panamax quayside cranes. The cranes were delivered by the 234-metre long bulk vessel, the Zheng Hua 3.

Read More
04 Dec 2002

PTP terima 2 kren Post Panamax

Berita Harian

PELABUHAN Tanjung Pelepas (PTP) semalam menerima dua kren terakhir bagi Fasa 1 pembangunannya iaitu dua unit kren dermaga Super Post Panamax daripada MMC-ZPMC dari China.

Read More
04 Dec 2002

PTP takes delivery of final 2 cranes

Business Times (M)

The Port of Tanjung Pelepas (PTP), South-East Asia’s fastest growing transhipment hub, has taken cranes for Phase 1, with the arrival of two units of Super Post Panamax quayside cranes from MMC-ZPMC of China yesterday morning.

Read More
04 Dec 2002

PTP terima 2 kren Post Panamax

Berita Harian

PELABUHAN Tanjung Pelepas (PTP) semalam menerima dua kren terakhir bagi Fasa 1 pembangunannya iaitu dua unit kren dermaga Super Post Panamax daripada MMC-ZPMC dari China.

Read More